![](https://moldychum.com/wp-content/uploads/2017/08/776px-Los_Angeles_River_through_downtown_evening.jpg)
A major restoration of 11 miles of the Los Angeles River is on the cusp of taking a leap forward. Early design and engineering to tear out concrete could begin in October.
LINK (via: CURBED Los Angeles)
A major restoration of 11 miles of the Los Angeles River is on the cusp of taking a leap forward. Early design and engineering to tear out concrete could begin in October.
LINK (via: CURBED Los Angeles)